- DAMIETTA COMBINED CYCLE POWER PLANT (Nov.1988 till July 1989):

Manufacture, supply and installation of approx. 20 tons of ductwork.
-Supply and installation internal and external insulation.
– Installation of Grills, Filters, Diffusers, Air and Fire Damper.
-Flexible connections.
-Connection of ductwork to the different equipments.

CAIRO SOUTH POWER PLANT (Mar.1989 till sep.1989):

-Manufacture, supply and installation of approx. 20 tons of ductwork.

-Supply and installation internal and external insulation.
– Installation of Grills, Filters, Diffusers, Air and Fire Damper.
-Flexible connections.
-Connection of ductwork to the different equipments.

MOVENPICK Jolie-Vile (Luxour):

-Supply and installation a complete silencer units.

ESACO Ltd. "Swiss Company":

Client ESACO Ltd.
Date (Nov.1988 till July 1989
Category Electro-Mechanical