Soilmec-Misr Company:

– Supply & Install FCU unit complete with hook up, filters valves “Crane” Seamless S40
pipes drains electric panel, thermostat & all required acc.
-Supply & install acoustic lining inside the ducts 10mm arma flex.
-Supply & install internal duct insulation 1″ thickness, 24 kg/m density.
-Supply & Install the Outlets, Volume dampers, Smoke damper, Fire damper
-Supply & install galvanized duct sheet metal ductwork for the Air Conditioning
distribution and Fresh air complete with supports hangs sleeves extractors and all
accessories.
-Supply & Install the firefighting system complete with sprinklers and seamless pipes
S40.
-Supply & Install the fire alarm system SIMENES complete with the control panel and
Smoke & Heat detectors needed.

MIRO Series Company S2-29:

Supply & Install FCU unit complete with hook up, filters valves “Crane” Seamless S40
pipes drains electric panel, thermostat & all required acc.
-Supply & install acoustic lining inside the ducts 10mm arma flex.
-Supply & install internal duct insulation 1″ thickness, 24 kg/m density.
-Supply & Install the Outlets, Volume dampers, Smoke damper, Fire damper
-Supply & install galvanized duct sheet metal ductwork for the Air Conditioning
distribution and Fresh air complete with supports hangs sleeves extractors and all
accessories.
-Supply & Install the firefighting system complete with sprinklers and seamless pipes
S40.
-Supply & Install the fire alarm system SIMENES complete with the control panel and
Smoke & Heat detectors needed.
-Supply & Install The electric power & lighting complete with all acc

BABEL Restaurant S1-21’ :

-Supply & Install FCU unit complete with hook up, filters valves “Crane” Seamless S40
pipes drains electric panel, thermostat & all required acc.
-Supply & install acoustic lining inside the ducts 10mm arma flex.
-Supply & install internal duct insulation 1″ thickness, 24 kg/m density.
-Supply & Install the Outlets, Volume dampers, Smoke damper, Fire damper
-Supply & install galvanized duct sheet metal ductwork for the Air Conditioning
distribution and Fresh air complete with supports hangs sleeves extractors and all
accessories.
-Supply & Install the firefighting system complete with sprinklers and seamless pipes
S40.
-Supply & Install the fire alarm system SIMENES complete with the control panel and
Smoke & Heat detectors needed.
-Supply & Install The electric power & lighting complete with all acc.

Devine Worx Company ‘MKANI Restaurant R1-11’:

Supply & Install FCU unit complete with hook up, filters valves “Crane” Seamless S40
pipes drains electric panel, thermostat & all required acc.
-Supply & install acoustic lining inside the ducts 10mm arma flex.
-Supply & install internal duct insulation 1″ thickness, 24 kg/m density.
-Supply & Install the Outlets, Volume dampers, Smoke damper, Fire damper
-Supply & install galvanized duct sheet metal ductwork for the Air Conditioning
distribution and Fresh air complete with supports hangs sleeves extractors and all
accessories.
-Supply & Install The electric power & lighting complete with all acc.

Katameya Down Town 2010

Client Katameya Down Town
Date 2010
Category Electro-Mechanical

Follow Us