-Manufacture and installation of approx. 30 tons of ductwork.
– Installation & manufacture internal insulation for the ducts.
– Installation & manufacture of Air and Fire Damper.
-Flexible connections.
-Connection of ductwork to the different equipments.

Future university at “el Tagamoa’ el-Khames” 2005/2006/2007:

Client Future university at “el Tagamoa
Date 2005-2006-2007
Category Electro-Mechanical

Follow Us