Manufacture and installation of approx. 5 tons of ductwork.
– Installation internal insulation for the ducts.
– Installation of Air and Fire Damper.
-Flexible connections.
-Connection of ductwork to the different equipments.
-Manufacture and installation all the filters needed for the hospital e.g. (Hepa filters,
Cleanable Filters, Bags Filters……etc.)

Dream Hospital 1st stage at 6th October 2005/2006.:

Client Dream Hospital
Date 2005 - 2006
Category Electro-Mechanical

Follow Us