ACE project is a project that we did all the electro-mechanical works on it (HVAC, Plumbing,
Firefighting, Electricity (low current & power), in the following is a brief about some of the
– Supply & Install DX unit complete with hook up, filters valves “Crane” Seamless S40
Pipes drains electric panel, thermostat & all required acc.
– Supply & install acoustic lining inside the ducts 10mm arma flex.
– Supply & install internal duct insulation 1″ thickness, 24 kg/m density.
– Supply & Install the Outlets, Volume dampers, Smoke damper, Fire damper
– Supply & install galvanized duct sheet metal ductwork for the Air Conditioning
distribution and Fresh air complete with supports hangs sleeves extractors and all
accessories.
– Supply & Install the firefighting system complete with sprinklers and seamless pipes
S40.
Supply & Install the fire alarm system SIMENES complete with the control panel and
Smoke & Heat detectors needed.
-Plumbing system complete with the submersible pumps
-Electricity Power & low current.
-Generator
-And more & more