BONSAI Restaurant (El-Sheikh Zaid -MAJJARAH) 2020:

BONSAI Restaurant project (2021) is a project that we did all civil works & MEP works on it,in the following is a brief about some of the works that we did… HVAC SYSTEM: – Supply & Install FCU units complete with hook up, filters valves “Crane” Seamless

Read More

ACE-HARDWARE (Sheraton Branch) 2014-2015:

ACE project is a project that we did all the electro-mechanical works on it (HVAC, Plumbing,Firefighting, Electricity (low current & power), in the following is a brief about some of the works that we did… – Supply & Install DX unit complete with hook up, filters valves

Read More

Cairo Festival City (CFC) 2012-2013

CARPPIO Restaurant : – Supply & Install FCU unit complete with hook up, filters valves “Crane” Seamless S40 pipes drains electric panel, thermostat & all required acc. – Supply & install acoustic lining inside the ducts 10mm arma flex. – Supply & install internal duct insulation 1″

Read More

Katameya Down Town 2010

Soilmec-Misr Company: – Supply & Install FCU unit complete with hook up, filters valves “Crane” Seamless S40pipes drains electric panel, thermostat & all required acc.-Supply & install acoustic lining inside the ducts 10mm arma flex.-Supply & install internal duct insulation 1″ thickness, 24 kg/m density.-Supply & Install

Read More

Blue Sky Ship at ASWAN “May 2008— June 2009”

Supply & install galvanized duct sheet metal of approx. 40 tons of ductwork completewith supports hangs sleeves extractors and all accessories.-Supply & install Black steel duct sheet metal of approx. 10 tons of ductwork completewith supports hangs sleeves extractors and all accessories.-Supply & install acoustic lining inside

Read More

Devine worx company art of food and beverage “2006— 2009”

Sat Hosnaia Rest. “branch el-mohandeseen”: – Supply & Install split units complete with hook up, filters expansion valves pipesdrains electric panel, thermostat & all required acc.Supply & install galvanized duct sheet metal ductwork for the fresh air systemcomplete with supports hangs sleeves extractors and all accessories.– Supply

Read More

Poliomyelitis Hospital starting work June 2006 until now

– Install D-X package unit complete with hook up, filters expansion valves pipes drainselectric panel, thermostat & all required acc.-Manufacture and installation of approx. 30 tons of ductwork.-Supply & Installation of Air Volume Dampers.-Flexible connections.-Connection of ductwork to the different equipments. – Installation & manufacture of internal

Read More
  • 1
  • 2