Supply, fabrication and installation air volume dampers for A/C modification of “Egypt

air” office.

– Repair and R-erection supply duct of air for A/C modification in lobby area from the

A.H.U. to the external grills complete with new line for suction to the fan of the A.H.U. &

change the circular vertical air supply duct to the rectangular ones 7 double deflection

grills.

– Modification position of rottener, including maintenance of A.H.U., fans, piping line and

ducts.

– Modification A/C system in IBIS area including maintenance of A.H.U., grills, dampers,

ductworks…….etc.

– A/C modification in school area including ductworks make of galvanized sheets

………….etc.

– Modification of Amira Wedding Hall air conditioning system include supply & erection

duct work make of galvanized sheets, insulation, piping lines, control dampers, inspection

door, maintenance A.H.U. ……….etc.

– Modification of aroussa hall air conditioning system include installation return fan,

ductworks, control dampers, inspection doors, insulation ductwork & piping lines,

volume dampers, maintenance of A.H.U. …etc.

Project

Client NILE HILTON HOTEL
Category Electro-Mechanical

Follow Us